Difference between revisions of "Status of the verification partners"
(→NORTH) |
|||
(24 intermediate revisions by 2 users not shown) | |||
Line 4: | Line 4: | ||
In order to become a member of the Gaia Follow-up Network for Transient Objects (Gaia-FUN-TO), especially to take part in the alerts verification, a potential partner must fullfil a number of requirements. The list of requirements is still to be fine-tuned, but they are: | In order to become a member of the Gaia Follow-up Network for Transient Objects (Gaia-FUN-TO), especially to take part in the alerts verification, a potential partner must fullfil a number of requirements. The list of requirements is still to be fine-tuned, but they are: | ||
+ | # take part in the test observations | ||
# react to an alert (or to a request with a target) and conduct its observations (in multiple filters) within 24h | # react to an alert (or to a request with a target) and conduct its observations (in multiple filters) within 24h | ||
# reduce the photometric data and submit to the [[Follow-up|CPCS]] within 24h from the observation (*) | # reduce the photometric data and submit to the [[Follow-up|CPCS]] within 24h from the observation (*) | ||
Line 10: | Line 11: | ||
(*) ''Note: the CPCS was created in order to facilitate the homogenous calibration of the photometric reductions. You are welcome to provide your own calibrated data and omit the CPCS step, but we will still need to obtain the data within 24h from the observation.'' | (*) ''Note: the CPCS was created in order to facilitate the homogenous calibration of the photometric reductions. You are welcome to provide your own calibrated data and omit the CPCS step, but we will still need to obtain the data within 24h from the observation.'' | ||
− | + | [[Verification:tests|Test observing campaigns and results]] | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
= Partners in test= | = Partners in test= | ||
Line 57: | Line 18: | ||
==== Loiano ==== | ==== Loiano ==== | ||
− | * Contact person: Gisella Clementini | + | * Contact person: Gisella Clementini, Giuseppe Altavilla |
* Location: Loiano, Bologna, Italy | * Location: Loiano, Bologna, Italy | ||
* 1.5m | * 1.5m | ||
− | + | ||
+ | <big>Status: <span style="color:#FFFFFF; background:#00ff00">automated data upload</span></big> | ||
==== Asiago==== | ==== Asiago==== | ||
− | * Contact person: Gisella Clementini | + | * Contact person: Gisella Clementini, Lina Tomasella |
* Location: Padova, Italy | * Location: Padova, Italy | ||
* 1.82m | * 1.82m | ||
+ | |||
+ | <big>Status: <span style="color:#FFFFFF; background:#ff0000">no data uploaded</span></big> | ||
+ | |||
==== APT2==== | ==== APT2==== | ||
− | * Contact person: Gisella Clementini | + | * Contact person: Gisella Clementini, Giuseppe Leto, |
* Location: Serra la Nave, Catania, Sicily | * Location: Serra la Nave, Catania, Sicily | ||
* robotic 80cm Ritchey-Cretien | * robotic 80cm Ritchey-Cretien | ||
+ | |||
+ | <big>Status: <span style="color:#FFFFFF; background:#00ff00">automated data upload</span></big> | ||
==== TNT ==== | ==== TNT ==== | ||
− | * Contact person: Anna Piersimoni | + | * Contact person: Anna Piersimoni |
* Location: Teramo, Italy, | * Location: Teramo, Italy, | ||
* 72cm Ritchey-Cretien | * 72cm Ritchey-Cretien | ||
− | ==== Belgian | + | <big>Status: <span style="color:#FFFFFF; background:#ff0000">no data uploaded</span></big> |
− | * Contact person: Laurent Eyer | + | |
+ | ==== Belgian Mercator ==== | ||
+ | * Contact person: Laurent Eyer, Lovro Palaversa | ||
* La Palma (Swiss time) | * La Palma (Swiss time) | ||
* 1.2m | * 1.2m | ||
+ | |||
+ | <big>Status: <span style="color:#FFFFFF; background:#00ff00">automated data upload</span></big> | ||
====Konkoly==== | ====Konkoly==== | ||
− | * Contact person: Laszlo Szabados | + | * Contact person: Laszlo Szabados, Gabor Marschalko |
* Location: Piszkesteto Mountain Station of the Konkoly Obs., Hungary | * Location: Piszkesteto Mountain Station of the Konkoly Obs., Hungary | ||
* 1m RCC, 60/90/180 cm Schmidt, 50 cm Cassegrain | * 1m RCC, 60/90/180 cm Schmidt, 50 cm Cassegrain | ||
+ | |||
+ | <big>Status: <span style="color:#FFFFFF; background:#5500ff">manual data upload</span></big> | ||
+ | |||
====PIRATE==== | ====PIRATE==== | ||
Line 92: | Line 66: | ||
* 43cm corr.D-K, remote and robotic controlled | * 43cm corr.D-K, remote and robotic controlled | ||
− | Status: automated data upload | + | <big>Status: <span style="color:#FFFFFF; background:#00ff00">automated data upload</span></big> |
+ | |||
+ | ''Names and affiliations: R. Busuttil, U. Kolb, J. Bochinski (Open University), V. Burwitz (MPE Garching), J. Rodriguez (OAM, Mallorca)'' | ||
==== pt5m ==== | ==== pt5m ==== | ||
Line 99: | Line 75: | ||
* 50cm mod.D-K, robotic | * 50cm mod.D-K, robotic | ||
− | Status: automated data upload | + | <big>Status: <span style="color:#FFFFFF; background:#00ff00">automated data upload</span></big> |
====Vienna==== | ====Vienna==== | ||
Line 106: | Line 82: | ||
* 1.5m RC | * 1.5m RC | ||
− | Status: | + | <big>Status: <span style="color:#FFFFFF; background:#00ff00">automated data upload</span></big> |
− | Small FoV: problems with calibrations. | + | Small FoV: occasional problems with calibrations. |
====ASV Serbia==== | ====ASV Serbia==== | ||
Line 115: | Line 91: | ||
* 60cm reflector | * 60cm reflector | ||
− | Status: automated data upload | + | <big>Status: <span style="color:#FFFFFF; background:#00ff00">automated data upload</span></big> |
+ | |||
+ | ''Names and affiliations: G. Damljanovic, O. Vince, R. Pavlovic, Z. Cvetkovic, M. Stojanovic (Astronomical Observatory, Belgrade)'' | ||
==== Tubitak Turkey ==== | ==== Tubitak Turkey ==== | ||
− | * Contact person: Irek Khamitov | + | * Contact person: Irek Khamitov |
* Location: Turkey | * Location: Turkey | ||
* 150cm (RTT150), 100cm, 60cm | * 150cm (RTT150), 100cm, 60cm | ||
− | Status: manual data upload within 24h | + | <big>Status: <span style="color:#FFFFFF; background:#0000ff">manual data upload within 24h</span></big> |
+ | |||
+ | ''Names and affiliations: Khamitov I.M.(1,3 ), Esenoglu H.(1,2), Bikmaev I.F.. (3,4), Zhuchkov R.Ya. (3,4) | ||
+ | |||
+ | 1. TÜBİTAK National Observatory, Antalya, Turkey | ||
+ | 2. İstanbul University, Istanbul, Turkey | ||
+ | 3. Kazan Federal University, Kazan, Russia | ||
+ | 4. Academy of Sciences of Tatarstan, Kazan, Russia | ||
+ | '' | ||
==== Bialkow/Wroclaw Poland ==== | ==== Bialkow/Wroclaw Poland ==== | ||
Line 129: | Line 115: | ||
* 60cm | * 60cm | ||
− | Status: automated data upload | + | <big>Status: <span style="color:#FFFFFF; background:#00ff00">automated data upload</span></big> |
+ | |||
+ | ==== Italian Supernova Project ==== | ||
+ | * Contact person: Simone Leonini | ||
+ | * Location: Italy | ||
+ | * 53cm | ||
+ | |||
+ | <big>Status: <span style="color:#FFFFFF; background:#5500ff">manual data upload</span></big> | ||
+ | |||
+ | ''Names and affiliations: S. Leonini, M. Conti, G. Guerrini, P. Rosi, L.M. Tinjaca Ramirez, | ||
+ | Montarrenti Observatory, Siena, Italy part of Italian Supernovae Serach Project (ISSP)'' | ||
+ | |||
+ | ==== Wise Observatory ==== | ||
+ | * Contact person: Yossi Shvarzvald, Dani Maoz | ||
+ | * Location: Israel | ||
+ | * 1m, 71cm, 45cm | ||
+ | |||
+ | <big>Status: <span style="color:#FFFFFF; background:#00ff00">automated data upload</span></big> | ||
+ | |||
+ | ==== Ostrowik Observatory ==== | ||
+ | * Contact person: Lukasz Wyrzykowski, Krzysztof Ulaczyk, Michal Pawlak | ||
+ | * Location: Poland | ||
+ | * 60cm | ||
+ | |||
+ | <big>Status: <span style="color:#FFFFFF; background:#00ff00">automated data upload</span></big> | ||
+ | |||
+ | ==== OHP ==== | ||
+ | * Contact person: Michel Dennefeld | ||
+ | * Location: France | ||
+ | * 1.2m | ||
+ | |||
+ | <big>Status: <span style="color:#FFFFFF; background:#ff0000">no data uploaded</span></big> | ||
+ | |||
+ | ==== Vega Slovenia ==== | ||
+ | * Contact person: Jure Japelj | ||
+ | * Location: Ljubljana, Slovenia | ||
+ | * 0.7m | ||
+ | |||
+ | <big>Status: <span style="color:#FFFFFF; background:#5500ff">manual data upload</span></big> | ||
+ | |||
+ | ---- | ||
=== '''SOUTH''' === | === '''SOUTH''' === | ||
==== Swiss Euler ==== | ==== Swiss Euler ==== | ||
− | * Contact person: Laurent Eyer | + | * Contact person: Laurent Eyer, Lovro Palaversa |
* La Silla, Chile | * La Silla, Chile | ||
* 1.2m | * 1.2m | ||
+ | |||
+ | <big>Status: <span style="color:#FFFFFF; background:#5500ff">manual data upload</span></big> | ||
====Danish/Czech Telescope ==== | ====Danish/Czech Telescope ==== | ||
Line 142: | Line 170: | ||
* La Silla | * La Silla | ||
* 1.54m, remotely controlled by Czechs | * 1.54m, remotely controlled by Czechs | ||
+ | |||
+ | <big>Status: <span style="color:#FFFFFF; background:#ff0000">no data uploaded</span></big> | ||
+ | |||
+ | Some data collected. | ||
==== GROND ==== | ==== GROND ==== | ||
Line 147: | Line 179: | ||
* 2.2m La Silla | * 2.2m La Silla | ||
* 7 channels: Optical/NIR: grizJHK | * 7 channels: Optical/NIR: grizJHK | ||
+ | |||
+ | <big>Status: <span style="color:#FFFFFF; background:#ff0000">no data uploaded</span></big> | ||
+ | |||
+ | Some data collected. | ||
+ | |||
+ | ==== SAAO ==== | ||
+ | * Contact person: Patricia Whitelock | ||
+ | * 1.9m, 1.0m | ||
+ | |||
+ | <big>Status: <span style="color:#FFFFFF; background:#ff0000">no data uploaded</span></big> |
Latest revision as of 15:38, 9 February 2015
Status of the partners preparing for the Gaia Alerts verification
Information about the requirements
In order to become a member of the Gaia Follow-up Network for Transient Objects (Gaia-FUN-TO), especially to take part in the alerts verification, a potential partner must fullfil a number of requirements. The list of requirements is still to be fine-tuned, but they are:
- take part in the test observations
- react to an alert (or to a request with a target) and conduct its observations (in multiple filters) within 24h
- reduce the photometric data and submit to the CPCS within 24h from the observation (*)
- flux calibrations better than 10% (0.1 mag)
(*) Note: the CPCS was created in order to facilitate the homogenous calibration of the photometric reductions. You are welcome to provide your own calibrated data and omit the CPCS step, but we will still need to obtain the data within 24h from the observation.
Test observing campaigns and results
Partners in test
NORTH
Loiano
- Contact person: Gisella Clementini, Giuseppe Altavilla
- Location: Loiano, Bologna, Italy
- 1.5m
Status: automated data upload
Asiago
- Contact person: Gisella Clementini, Lina Tomasella
- Location: Padova, Italy
- 1.82m
Status: no data uploaded
APT2
- Contact person: Gisella Clementini, Giuseppe Leto,
- Location: Serra la Nave, Catania, Sicily
- robotic 80cm Ritchey-Cretien
Status: automated data upload
TNT
- Contact person: Anna Piersimoni
- Location: Teramo, Italy,
- 72cm Ritchey-Cretien
Status: no data uploaded
Belgian Mercator
- Contact person: Laurent Eyer, Lovro Palaversa
- La Palma (Swiss time)
- 1.2m
Status: automated data upload
Konkoly
- Contact person: Laszlo Szabados, Gabor Marschalko
- Location: Piszkesteto Mountain Station of the Konkoly Obs., Hungary
- 1m RCC, 60/90/180 cm Schmidt, 50 cm Cassegrain
Status: manual data upload
PIRATE
- Contact person: Ulrich Kolb, Richard.Busuttil
- Location: Mallorca
- 43cm corr.D-K, remote and robotic controlled
Status: automated data upload
Names and affiliations: R. Busuttil, U. Kolb, J. Bochinski (Open University), V. Burwitz (MPE Garching), J. Rodriguez (OAM, Mallorca)
pt5m
- Contact person: Stuart Littlefair
- Location: La Palma
- 50cm mod.D-K, robotic
Status: automated data upload
Vienna
- Contact person: Werner Zeilinger
- Location: Austria
- 1.5m RC
Status: automated data upload
Small FoV: occasional problems with calibrations.
ASV Serbia
- Contact person: Goran Damljanovic, Oliver Vince
- Location: Serbia
- 60cm reflector
Status: automated data upload
Names and affiliations: G. Damljanovic, O. Vince, R. Pavlovic, Z. Cvetkovic, M. Stojanovic (Astronomical Observatory, Belgrade)
Tubitak Turkey
- Contact person: Irek Khamitov
- Location: Turkey
- 150cm (RTT150), 100cm, 60cm
Status: manual data upload within 24h
Names and affiliations: Khamitov I.M.(1,3 ), Esenoglu H.(1,2), Bikmaev I.F.. (3,4), Zhuchkov R.Ya. (3,4)
1. TÜBİTAK National Observatory, Antalya, Turkey 2. İstanbul University, Istanbul, Turkey 3. Kazan Federal University, Kazan, Russia 4. Academy of Sciences of Tatarstan, Kazan, Russia
Bialkow/Wroclaw Poland
- Contact person: Zbyszek Kolaczkowski
- Location: Poland
- 60cm
Status: automated data upload
Italian Supernova Project
- Contact person: Simone Leonini
- Location: Italy
- 53cm
Status: manual data upload
Names and affiliations: S. Leonini, M. Conti, G. Guerrini, P. Rosi, L.M. Tinjaca Ramirez, Montarrenti Observatory, Siena, Italy part of Italian Supernovae Serach Project (ISSP)
Wise Observatory
- Contact person: Yossi Shvarzvald, Dani Maoz
- Location: Israel
- 1m, 71cm, 45cm
Status: automated data upload
Ostrowik Observatory
- Contact person: Lukasz Wyrzykowski, Krzysztof Ulaczyk, Michal Pawlak
- Location: Poland
- 60cm
Status: automated data upload
OHP
- Contact person: Michel Dennefeld
- Location: France
- 1.2m
Status: no data uploaded
Vega Slovenia
- Contact person: Jure Japelj
- Location: Ljubljana, Slovenia
- 0.7m
Status: manual data upload
SOUTH
Swiss Euler
- Contact person: Laurent Eyer, Lovro Palaversa
- La Silla, Chile
- 1.2m
Status: manual data upload
Danish/Czech Telescope
- Contact person: Pavel Koubsky and Uffe Jorgensen
- La Silla
- 1.54m, remotely controlled by Czechs
Status: no data uploaded
Some data collected.
GROND
- Contact person: Jochen Greiner, MPIE
- 2.2m La Silla
- 7 channels: Optical/NIR: grizJHK
Status: no data uploaded
Some data collected.
SAAO
- Contact person: Patricia Whitelock
- 1.9m, 1.0m
Status: no data uploaded